There’s one six-foot section of railing to install on top of the retaining wall, plus a gate. It would have been installed today, except the manufacturer, who put the parts list together based off a measured drawing, shorted us one box of mounting brackets. They’re on order, but won’t arrive until next week, after the wedding reception. Oh well. It will be fine.
Happy Monday morning firsties, Gerbil Nation!
There’s a reason why those electrical boxes should remain closed.
I hope all y’all are doing all right.
I would bet whoever opened that box found speed they never knew they were capable of.
I would imagine so. Sort of like when a certain Gerbil ignited her backyard bonfire.
I still get triggered when the stove burner lights.
LOL
There’s one six-foot section of railing to install on top of the retaining wall, plus a gate. It would have been installed today, except the manufacturer, who put the parts list together based off a measured drawing, shorted us one box of mounting brackets. They’re on order, but won’t arrive until next week, after the wedding reception. Oh well. It will be fine.